Skip to content
D
Documentation

Create an MRQ

task
10 min readUpdated

Create a material requisition (MRQ), find it again, and hand the saved request to the next procurement task.

Before you start

An MRQ is the material-requisition starting point for procurement work. It records the products or requirements that procurement must source before the work continues through a request for quotation (RFQ), quotation, purchase order (PO), warehouse handling, and delivery.

Use the material-requisition list and new-MRQ screen to create or find an MRQ. A bill of materials (BOM) can supply the material need; the MRQ starts the procurement record that carries that need into supplier and order work.

An MRQ can remain active or become cancelled:

StatusMeaning
ActiveThe MRQ remains in active procurement work.
CancelledThe MRQ has been converted to the cancelled state.

Choose the type that matches the work:

TypeMeaning
ProjectProducts and Additional Requirements are available.
StockProducts and Additional Requirements are available.
NeedsProducts and Additional Requirements are available.
Safety stockA stock MRQ variant.
If you need to…Go to
Reach the material-requisition listFind an MRQ
Open the blank formOpen a new MRQ
Recognize the saved recordFind a saved MRQ
Learn the fields and product areaUnderstand the MRQ screen
Enter products and save the requestEnter and save the MRQ
Work with conditional actionsHandle MRQ variations
Correct a save or loading problemWhen saving goes wrong
Continue through procurementContinue with the saved MRQ
Complete a saved MRQComplete an MRQ record
Follow the full procurement chainPurchase job workflow

Find an MRQ

The MRQ list is the starting place for locating existing material requisitions or opening a new one. Sign in before opening the material-requisition list.

Prerequisites

  • Your subscription includes the MRQ feature.
  • Your account has the permission needed for the action you want to take.
  • A list layout is available when the list needs a saved layout to draw its columns.

Steps

  1. Open the material-requisition list.
  2. Confirm that the purchasing tabs are visible: All, RFQs, Quotations, POs, Archived, and MRQs.
  3. To start a direct purchase order from the list, select Direct P.O. when your subscription includes the feature and your account may create a new MRQ.

Selecting Direct P.O. opens the direct-purchase-order screen. That screen shows Purchaser, Product Type, Package Title, Products, + Direct P.O., Save, and Save and Close.

The direct-purchase-order screen opened from the MRQ list

Your list layout determines which columns appear; use the headers visible in your list. The list shows MRQ no., MRQ type, Title, Required receiving date, Sales, and Short vendor list. The toolbar also exposes Refresh, Table Layout, and Settings.

The MRQ list tabs and identifying columns

Note: Work from the headers visible in your list. The list layout determines which columns you can use to identify a saved MRQ.

Result: The MRQ list is open with its purchasing tabs and identifying columns.

Continue with Open a new MRQ to create a request, or with Find a saved MRQ to return to an existing one.

Open a new MRQ

Use a new MRQ when you need to create the material-requisition record that begins procurement.

Prerequisites

  • The MRQ list is available.
  • Your account may create a new MRQ.

Steps

  1. Open the new-MRQ form from the material-requisition list.
  2. Confirm that the blank form opens.
  3. Confirm that the blank form shows MRQ title, Required Receiving Date, Products, Additional Requirements, Save, and Save and Close.

The list's Direct P.O. action is a different entry point from the new-MRQ form.

Result: The blank MRQ form is open and ready for header entry. No MRQ is saved.

Continue with Enter and save the MRQ to record the request.

Find a saved MRQ

A saved MRQ is the procurement request that can continue into RFQ, direct PO, and follow-up work. Use the saved list row to return to its edit screen rather than reopening the blank form.

Prerequisites

  • An MRQ has been saved.
  • The MRQ list is available.

Steps

  1. Open the MRQ list.
  2. Choose the list tab that contains the saved record.
  3. Identify the record from MRQ no., MRQ type, Title, Required receiving date, Sales, or Short vendor list.
  4. Open the saved row.
  5. Confirm that the saved edit screen shows RFQ, Direct PO, Last Modifications, Save, and Save and Close.
  6. Confirm that the attached product row remains in the product area.

The saved record is distinct from the blank form because it has the saved-MRQ actions and retains the attached product row.

Result: The saved MRQ edit screen is open with its follow-up actions and attached product row.

Continue with Understand the MRQ screen to review the saved record, or with Continue with the saved MRQ to hand it to procurement.

Understand the MRQ screen

The MRQ screen identifies the request in its header, keeps selected vendors with it, and holds requested products in a separate product area.

AreaWhat you see
HeaderBranch, MRQ title, Required Receiving Date, and Short Vendors List
Product areaProducts, a grid, and Additional Requirements
Save areaSave and Save and Close
Empty gridNo data before a product is attached

MRQ title and Required Receiving Date are required. Required Receiving Date cannot be earlier than the date when the purchasing job was created. The product grid shows #, Product, Unit, Qty, Purchasing, and Forecasted Receiving Date.

Select the Short Vendors List picker to see the available supplier choices. Products and Additional Requirements are separate actions; they are not two names for the vendor picker.

The available supplier choices in Short Vendors List

The editable header shows the required fields and product-entry actions.

Enter and save the MRQ

Enter and save the MRQ when the material requirement is ready to record and at least one product is known.

Prerequisites

  • You are on the blank MRQ form.
  • You know the MRQ title.
  • You know the required receiving date.
  • You can select the product to attach.

Steps

  1. Enter the request name in MRQ title.

  2. Choose a date in Required Receiving Date that is not earlier than the date when the purchasing job was created.

  3. Select Products.

  4. In the product picker, use Product, Description, Category, Group, Withdrawal, Valuation, or Internal product no. to locate the product.

  5. Select the product row.

  6. Select OK.

  7. Confirm that the product appears in the MRQ grid with its row number, description, and Pieces; the quantity cell can remain blank until a quantity is entered.

  8. Select one save option:

    If you want to…Select
    Keep the saved MRQ openSave
    Save the MRQ and leave the formSave and Close
  9. Confirm the message Saved Successfully.

The product picker also shows Insert product and New product. New product belongs to the product-creation path.

The product picker and its available-product controls
The selected product attached to the MRQ grid

After saving, the edit screen retains RFQ, Direct PO, Last Modifications, Save, Save and Close, and the attached product row.

The saved MRQ edit screen and its follow-up actions

Result: The MRQ is saved, Saved Successfully appears, and the saved MRQ edit screen is open.

Continue with Handle MRQ variations when the MRQ type or saved state changes, or with Continue with the saved MRQ for the next procurement action.

Handle MRQ variations

Variations appear when the MRQ type, saved state, permissions, or action being taken changes. Use the normal creation path first; popup-only fields belong to the action that opens their popup.

SituationReader action or conditionFields or result
Additional requirementsSelect Additional Requirements for an eligible MRQ typeQuantity minimum 0.01
Vendor restrictionOpen Short Vendors ListThe picker supplies the available supplier choice
Product entryUse Products when the MRQ type is stock, project, or needsThe product picker opens
Requirement entryUse Additional Requirements when the MRQ type is stock, project, or needsThe requirement-entry path opens
RegretOpen the regret actionRegret Reason, Regret Date, and Comment
CancellationOpen the cancellation actionCancellation Reason, Cancellation Date, Amount, and Comment
Cancellation amountThe cancellation concerns items at Order stage or an orderAmount is available
RejectionOpen the reject actionReject Date and Comment
DeliveryOpen the delivery-date actionDelivery Date cannot exceed Today

The RFQ and Direct PO actions require a saved MRQ, the relevant permission, no unsaved changes, and a non-child display. Last Modifications requires a saved MRQ.

Result: You use the normal product and vendor actions for initial entry, and reserve popup fields and downstream actions for the state that makes them available.

Continue with When saving goes wrong if a message blocks the action, or with Continue with the saved MRQ after the action succeeds.

When saving goes wrong

Match the message on screen to the correction in this table. The list export and deletion paths are outside this create-and-find procedure.

MessageWhat to check or do
Package must have at least one itemAdd an item to the package before saving.
You cannot save without adding at least one productSelect Products, attach a product, and save again.
One of products has no quantityEnter a quantity for every product row that requires one.
Check mandatory field(s)Review the required fields, especially MRQ title and Required Receiving Date.
This Field Is RequiredComplete the required field identified beside the message.
Required Receiving AfterChoose a receiving date that is not earlier than the date when the purchasing job was created.
Saving ErrorThe save did not complete; review the form and try the save action again.
An error occurred while processing your requestReview the form and retry after correcting the displayed issue.
Server ErrorThe server rejected the request; retry when the service is available.
Updated SuccessfullyThe update completed.
Updating ErrorThe update did not complete; review the form and retry.
Loading errorThe requested MRQ content did not load; return to the list and open the record again.
Server errorThe server returned an error while processing the action.
Converted to cancelledThe MRQ was converted to the cancelled state.

The messages Updated Successfully, Updating Error, Saved Successfully, and Saving Error belong to update or save outcomes. The validation and error messages identify the correction for their respective branches.

After correcting a save problem, return to Enter and save the MRQ.

Continue with the saved MRQ

After saving, the MRQ is the record from which procurement work continues. Its saved edit screen shows RFQ, Direct PO, and Last Modifications, as well as Save and Save and Close.

If you need to…Select or open
Ask suppliers for quotationsRFQ
Create a direct purchase orderDirect PO
Review the record's change historyLast Modifications
Complete products or requirementsComplete an MRQ record
Follow the MRQ-to-order routePurchase job workflow

An active MRQ uses the Active state. A cancelled MRQ uses the Cancelled state. Continue with the focused RFQ, quotation, purchase-order, direct purchase-order, or saved purchase-job page for that next reader job.

Result: The saved MRQ remains available for follow-up and for the next procurement hand-off.

Use Complete an MRQ record for completion work, or follow the Purchase job workflow for the wider procurement chain.

Out of scope

This page stops at creating, finding, and handing off an MRQ. The following surfaces belong to other reader jobs:

  • Files panel: Your request was completed successfully belongs to the file panel.
  • File and library dialogs: Just '_'‘-''.' And '&' Characters Accepted belongs to shared dialogs.
  • Product editor: Forbidden characters detected. Please remove them and try again. and The first variant cannot be deleted belong to product maintenance.
  • Bill of materials: This product is already included in BOM, Sales order is archived, Booked quantity for this job is greater than the required BOM quantity, You cannot edit or delete the product after the purchase package is created, and You cannot edit the product after the PO is created belong to BOM work.
  • Product editor integration: An error occurred while connecting to your CRM system. and Please select one product belong to product maintenance.
  • MRQ deletion procedure: Cannot be deleted. Product is in purchasing.
  • MRQ deletion procedure: Deleted Successfully.
  • MRQ deletion procedure: Job deleted successfully. List Export and row Delete are not part of this create-and-find reader job.
  • Purchase job workflow — follow the procurement chain from MRQ through RFQ, quotation, purchase order, and received work.
  • Complete an MRQ record — complete products, requirements, and Last Modifications on a saved MRQ.
  • Purchase-job RFQs — continue with RFQ work.
  • Purchase-job orders — continue with purchase-order work.
  • Create a direct purchase order — continue from Direct PO.
  • Purchase-job record — work with the broader saved purchase-job record.
  • Find active purchase job work — use the focused work-list pages.

Was this page helpful?

Need help using the product?

Create an MRQ — PAMS Fresh Generation