# List

_Applications › projects management › Buyout To Order_

![List](https://atloriaassets.blob.core.windows.net/assets/a438221c-c1af-407c-b9e6-a56c986db846/9c1eadf0fecb84638ffd3c0baf830662.png)
*List*

## Overview

The Buyout To Order list provides a working view of packages and sales jobs that are to be ordered within Project Management. Purchasing officers, project managers, and account managers use it to review package and job references, assigned purchasers, offer types, bid due dates, and sub-supplier information before continuing their buyout work.

Use this list when you need to find a specific package, review the available buyout records, apply a preferred column arrangement, or export the displayed information for operational follow-up.

## Settings

Before working with the list regularly, select or create a layout that displays the columns your role needs. Layout settings affect how the list is arranged; they do not change the underlying buyout records.

| Setting or action | Purpose |
|---|---|
| **Layout name** | Identifies the layout that you are creating, saving, or updating. |
| **Standard Layout** | Returns the list to the standard layout. |
| **Add Layout** | Starts creation of an additional layout. |
| **Columns Chooser** | Opens the column selection control for the list layout. |
| **Update Current** | Saves changes to the currently selected layout. |
| **Delete Current** | Removes the current layout. |
| **Save** | Saves the layout changes. |
| **Cancel** | Closes the layout action without saving the current changes. |
| **Delete** | Deletes the selected layout item when available in the layout action. |

> **Tip:** Create a layout that shows the information you review most frequently, such as Package no., Sales job No., Purchaser, Offer type, and Bid due date.

## Workflow

1. Open the Buyout To Order list from Applications, then select **PM** and **To Order (MRQ)**.

   The list displays buyout-related package records. Review the visible columns to identify the package and sales job you need to work with. Typical list information includes package number, sales job number, purchaser, offer type, bid due date, and sub-supplier.

   ![List](https://atloriaassets.blob.core.windows.net/assets/a438221c-c1af-407c-b9e6-a56c986db846/3791a73e828cd81bcd4888837f8e954b.png)
*List*

2. Decide whether you need the standard list arrangement or a role-specific layout.

   - To return to the default arrangement, select **Standard Layout**.
   - To work with a different layout, select **Layout options (icn icn-layoout)** and choose the required layout action.
   - To adjust which information is shown, select **Columns Chooser** and choose the columns required for your review.

   Use the list layout to focus on the decision information relevant to the current buyout activity. For example, a purchaser may prioritise purchaser assignment and bid due date, while a project manager may focus on package and sales job references.

   ![List](https://atloriaassets.blob.core.windows.net/assets/a438221c-c1af-407c-b9e6-a56c986db846/fed28fbacba97937805243511c5e1955.png#atloria-annotations=%7B%22annotations%22%3A%5B%7B%22type%22%3A%22box%22%2C%22x%22%3A84.97%2C%22y%22%3A13.49%2C%22w%22%3A9.39%2C%22h%22%3A4.29%2C%22label%22%3A%221%20%20Add%20Layout%22%7D%2C%7B%22type%22%3A%22marker%22%2C%22n%22%3A1%2C%22x%22%3A89.67%2C%22y%22%3A15.63%7D%2C%7B%22type%22%3A%22box%22%2C%22x%22%3A84.97%2C%22y%22%3A25.04%2C%22w%22%3A9.39%2C%22h%22%3A4.29%2C%22label%22%3A%223%20%20Columns%20Chooser%22%7D%2C%7B%22type%22%3A%22marker%22%2C%22n%22%3A3%2C%22x%22%3A89.67%2C%22y%22%3A27.18%7D%5D%7D)
*List*

![Add Layout](https://atloriaassets.blob.core.windows.net/assets/a438221c-c1af-407c-b9e6-a56c986db846/753240edb845d4002876460f066af518.png)

![Columns Chooser](https://atloriaassets.blob.core.windows.net/assets/a438221c-c1af-407c-b9e6-a56c986db846/5c9097d8945cfb8330fcea89e60b9cd8.png)

3. If the required arrangement does not already exist, create and save a new layout.

   1. Select **Add Layout**.
   2. Enter a clear value in **Layout name**.
   3. Select **Columns Chooser** and set the required visible columns.
   4. Select **Save** to retain the layout, or select **Cancel** to abandon the changes.

   Use a descriptive layout name so that users can distinguish layouts created for purchasing review, project follow-up, or reporting preparation.

   ![List](https://atloriaassets.blob.core.windows.net/assets/a438221c-c1af-407c-b9e6-a56c986db846/fb7d7bbc4e45cd579672aae32db0d9d9.png)
*List*

   > **Note:** Layout changes control the presentation of the list. They do not amend the package, job, purchaser, or supplier information shown in the records.

4. When reviewing an existing layout, decide whether to keep, update, or remove it.

   - If the layout is suitable, continue using it to review the listed records.
   - If you have changed its columns or arrangement, select **Update Current** to save the revised current layout.
   - If the current layout is no longer required, select **Delete Current**. Where the layout action displays **Delete**, use it to delete the selected layout item.

   Confirm that you have selected the intended layout before using a delete action.

5. Find the required buyout record and prepare the list for follow-up.

   1. Enter a package number, sales job number, purchaser name, offer type, bid due date, or other available list value in **Search**.
   2. Review the filtered results against the displayed columns.
   3. Select **Refresh (icn-update)** when you need to refresh the list view.
   4. Select **Export** when you need an exported copy of the displayed list information.

   Search before exporting when you need to limit the output to a particular package, job, purchaser, or due-date group.

   > **Warning:** Review the active layout and search results before selecting **Export**. The usefulness of the exported list depends on the columns and records currently displayed.

## Examples

A purchasing officer needs to review buyout packages assigned to a particular purchaser before upcoming bid due dates.

1. Open **PM**, then select **To Order (MRQ)** to display the Buyout To Order list.

2. Select **Layout options (icn icn-layoout)**. The officer finds that the current layout does not show the required combination of package, purchaser, offer type, bid due date, and sub-supplier information.

3. Select **Add Layout** and enter `Purchaser Due Date Review` in **Layout name**.

4. Select **Columns Chooser** and configure the layout to display Package no., Sales job No., Purchaser, Offer type, Bid due date, and Sub-supplier. Select **Save**.

5. In **Search**, enter the purchaser name to reduce the list to the relevant packages. Review the bid due dates and the sub-supplier values for the returned records.

6. Select **Export** to produce a working copy of the filtered list for the purchaser’s buyout follow-up.

The officer can later return to the same presentation by selecting the saved layout, or use **Standard Layout** when the standard list arrangement is required.

## Tips

> **Tip:** Use **Search** with a package number or sales job number when you need to locate a specific buyout item quickly.

> **Note:** Use **Update Current** only when you intend to change the layout currently in use. Use **Add Layout** when you need to preserve the current arrangement and create a separate view.

> **Warning:** Do not use **Delete Current** merely to reset a layout. Select **Standard Layout** when you need the standard presentation instead.

## Troubleshooting

| Symptom | Likely cause | Fix |
|---|---|---|
| The required package or sales job is not visible. | A search value may be restricting the displayed records. | Review and amend the value in **Search**, then select **Refresh (icn-update)**. |
| Important information is not shown in the list. | The selected layout does not include the required columns. | Select **Columns Chooser**, add the required columns, and select **Update Current** or create a layout with **Add Layout**. |
| A revised layout is not available later. | The layout changes were not saved. | Use **Save** when creating a layout, or use **Update Current** when changing an existing layout. |
| The list presentation is unsuitable for the current task. | A role-specific layout is active. | Select **Standard Layout**, or select a more suitable saved layout through **Layout options (icn icn-layoout)**. |

## Related pages

- [Buyout To Order](doc:projects-management-buyout-to-order-new)
- [projects management — Overview](doc:projects-management-overview)
- [projects management — Learning Path](doc:workflows-projects-management)
- [projects management](doc:projects-management-guide)
- **List**
- [orders](doc:orders-guide-2)
- [delivered orders](doc:delivered-orders)
- **NewDirectOrder**
- [NewInstantJob](doc:projects-management-edit-list-newinstantjob)
- [production order](doc:production-order)
- [Shipping Order](doc:projects-management-shipping-order-new)